Operating performance
1994:100000 dwt “Anyan” :Design fabrication and installation for flexible accommodation ladder.
1995:Greece”AO.SMITH” rush to repair hatch cover in anchorage ground.
1996:”Xianghui”:Anchor chain roll fabricated and renew.
1997:”MOONVAZS”: broken crane arm lower renew.
1998:”xingli”: crane repaired and “Hongyuan”yearly repaired
1999:”Shuyu”:main engine overhaul.
2000:”Shuntong” main engine cylinder head refurbishment.and “722”warship boiler overhaul.
2001:”SUNVAZS”:port side bow renew.25T portal crane heavy repair.
2002:”Shuntai”:24pcs hatch cover refurbishment.
2003:”MOONVAS”:mastroom crane arm repaired and “722”warship crane test and mast fabricated ans installed.
2004:”Fengzhong,Fengxin,Fengwen,Fengjie”:ship name renew.
2005:”400T oil press machine overhaul.and “Wenqiao”outfitting renew.
2006:”Changshou” hatch cover average repaired.
2007:”Shentai”,”Haijishun” propeller blade rewelding.
2008:”yongtai”propeller blance cutting under water and “Zhonghua”bottom renew
2009:”Zhongkaiwan”:main engine overhaul.
2010:”Fupingshan”:take off mast .
2011:”Zhongkaiwan” main transmission overhaul and renew gear bearing.
2012:”Elegance”:4 pcs 30T crane whole take out and store.and “Fenghe” windlass gear shaft refurbishment.