                                                       Operating performance

1994:100000 dwt “Anyan” :Design fabrication and installation for flexible accommodation ladder.

1995:Greece”AO.SMITH” rush to repair hatch cover in anchorage ground.

1996:”Xianghui”:Anchor chain roll fabricated and renew.

1997:”MOONVAZS”: broken crane arm lower renew.

1998:”xingli”: crane repaired and “Hongyuan”yearly repaired

1999:”Shuyu”:main engine overhaul.

2000:”Shuntong” main engine cylinder head refurbishment.and “722”warship boiler overhaul.

2001:”SUNVAZS”:port side bow renew.25T portal crane heavy repair.

2002:”Shuntai”:24pcs hatch cover refurbishment.

2003:”MOONVAS”:mastroom crane arm repaired and “722”warship crane test and mast fabricated ans installed.

2004:”Fengzhong,Fengxin,Fengwen,Fengjie”:ship name renew.

2005:”400T oil press machine overhaul.and “Wenqiao”outfitting renew.

2006:”Changshou” hatch cover average repaired.

2007:”Shentai”,”Haijishun” propeller blade rewelding.

2008:”yongtai”propeller blance cutting under water and “Zhonghua”bottom renew

2009:”Zhongkaiwan”:main engine overhaul.

2010:”Fupingshan”:take off mast .

2011:”Zhongkaiwan” main transmission overhaul and renew gear bearing.

2012:”Elegance”:4 pcs 30T crane whole take out and store.and “Fenghe” windlass gear shaft refurbishment.